Laying and construction of gravity sewer network of approximately 10.8 km with open cut 5.4 km and trenchless 5.4 km; Laying of 1.6 km HDPE force main of external bore 315 mm along with construction of two pumping stations including electrical, mechanical, SCADA, etc.
dowload pdf ⇓